Installers blowing insulation across a ranch attic floor
Home › New Construction and Remodel Insulation

New Construction and Remodel Insulation in Lexington, KY

Building a new home or adding on in Lexington? We insulate it at the right stage: foam and batts while the walls are open, and blown-in on the attic floor once the ceilings are up, all to the code in force. Ask for a free estimate and we'll bid it from your plans.

  • Licensed & insured
  • Free estimates
  • Financing available
  • Workmanship warranty
Free insulation estimateTell us about the house. We will call to set a time.

No spam, ever. By submitting, you agree to our Privacy Policy.

Insulation for a new home: what goes where

A new house gets a different insulation in each part, and we bid each part on its own. Here's how we usually lay it out:

  • Exterior walls: fiberglass batts cut to fit around boxes and pipes, mineral wool if you want it, or spray foam.
  • Attic floor: blown-in fiberglass or cellulose, or batts laid between and across the joists.
  • Roof deck: spray foam under the roof for an unvented attic or a cathedral ceiling.
  • Rim joists and odd framing: closed-cell foam, which seals the gaps batts can't.
  • Floors over a crawl space: batts between the joists. See crawl space insulation.

Spray foam comes in two kinds, and the choice matters for where it goes. We explain the trade-offs on open-cell vs closed-cell. For a new 1,800 to 2,600 sq ft house, our installed price for open-cell foam in the exterior walls at 3.5 inches runs $1,400 to $6,300. Foam by thickness is on our spray foam cost page.

Foam left exposed needs a covering over it. Why is on our basement insulation page.

Close view of new wall insulated before drywall

How the job goes at each build stage

Wall insulation has to land between rough-in and drywall, so we work to your builder's schedule. When you're building in Lexington, we're the insulation crew to call.

  1. Plans and bid. We read the plans: wall framing, attic type, any bonus room or vaulted ceiling. You get a written bid for each area.
  2. After rough-in. Once plumbing, wiring and HVAC lines are in, we seal the gaps in the framing. That's the cheapest time to air seal a house.
  3. Walls, open ceilings and roof deck. Batts go in the stud bays, or foam to the thickness on the bid.
  4. Inspection, if your permit has one. The walls are done and ready to see before the drywall crew shows up.
  5. Attic floor. After the drywall ceilings are up, we blow or lay the attic to the depth on the bid.
  6. Clean-up. We bag the scraps and leave the site ready for the next trade.

What the code asks of a new home in Kentucky

The residential building code in force statewide is the 2018 Kentucky Residential Code, Third Edition (August 2024), built on the 2015 International Residential Code and effective December 3, 2024. Where the two conflict, the Kentucky amendments control.

Its energy chapter is the 2009 IECC with Kentucky's own amendments. That's the chapter that sets your insulation, so we check your plans against it before we bid.

For a new house here, the 2009 IECC table for our climate zone, zone 4, sets R-38 for the attic and R-13 for the walls. That's the minimum. We build the bid to meet it and show you where going higher is worth it.

Framing changes what fits. A 2x6 wall takes R-19 or R-21 batts, more than a 2x4 wall can hold. What those R-numbers mean is on our R-value page.

Permits and inspections on new work

Kentucky's statewide code does not require a permit, inspection or certificate of occupancy for a single-family house unless your city or county requires one by local ordinance. The rule differs by town, so we check it for your address before the job starts.

In Lexington, building permits come from Building Inspection, under Planning, Preservation, and Development. We pull the permit where one is needed. Your city or county may also ask a contractor to hold a local business license.

Building in Scott or Jessamine County? We insulate new homes and additions there too. See our Scott County and Jessamine County pages.

Insulating an addition or remodel

An addition gets insulated to the same energy rules as a new house. The part of your house you're not changing doesn't have to be brought up to code.

A remodel works much the same way. New work meets the code for new construction. But when we open an existing wall, ceiling or floor cavity, the code only asks that it be filled with insulation, not brought up to the full new-home R-value. So a gutted old wall gets its bays filled, and you decide whether to go further.

Open walls are where we do this work, before the drywall goes back. Finished walls you don't want to open are a different job, covered on wall insulation. A bonus room over a garage is on garage insulation, and a basement finish is on basement insulation.

Common questions

Should a new house get more insulation than the code asks?

On the attic floor we can blow fiberglass or cellulose to R-49.

Is spray foam worth it in a new build?

It costs more than batts, but it seals as it fills. It earns its keep on a roof deck, rim joists and framing that's hard to fit. In plain stud walls, batts do the job well, and we'll tell you which way we'd go for your plans.

Do you work for builders as well as homeowners?

Yes. A builder or a family building its own home can ask for the free estimate. We bid from the plans and work to the schedule the builder sets.

Get a Free Bid on Your New Home's Insulation

Ask for a free estimate or call us. We'll bid the insulation from your plans and fit it to your build schedule.

Licensed & insured · Free estimates

More from our insulation team

Sources for the local facts on this page
Call (859) 710-5565 Free Estimate